Construction of 4 lane Access Controlled New Greenfield Highway Section (Mancherial - Warangal) from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 Km (Total length 39.890 km) under other Economic Corridor (NH (O)) programme as part of Nagpur - Vijayawada Corridor on Hybrid Annuity mode in the State of Telangana (Package-III).
Scope of Work
Construction of Four Lane access controlled highway from Pangidipalle to Oorugonda on NH-163G including Major bridges, Interchange, Minor Bridges, VUP, LVUP, Culverts, drains, etc.
Client
National Highways Authority of India (NHAI)
Length in Km
39.890 Km.
Pavement Classification
Flexible Pavement for Main Carriageway and Service/Slip Road, Rigid Pavement for Toll Plaza.